Bolsa Chica Timeline

January 1994 DRAFT ENVIRONMENTAL IMPACT REPORT The over 1200 page BC EIR has been prepared to respond to proposed Koll project. The 1st draft EIR (1992) was prepared by Army Corps of Engineers. The 2nd EIR was prepared when Koll dropped plans for annexation to the City and requested the County to coordinate the project.

Will you allow Outer Bolsa Bay to be sacrificed?
(Originally printed in The Tern Tide October 1994)
Pristine Outer Bolsa Bay will be decimated by dredging a 50 ft. wide swath from the tidegates to the Warner Bridge. Also riprap will be placed along the perimeter of the marsh adjacent to PCH. Notify the county by Oct. 6 that these “restoration plans” are unacceptable! ** RESTORE THE TIDAL INLET at the south end of the wetlands! ** ** The tidal inlet option must be included in the EIR!**



Click on a green square to learn about the events of that year which are a part of the efforts to preserve, protect and enhance the Bolsa Chica
1983 2007 1984 1986 1987 1988 1989 1990

home   |   about the amigos   |   tours of bolsa chica  |   volunteers |  news   |   join/donate/shop 
birds & science   |   history of bolsa chica   |   the FAQs   |    restoration   |   calendar   |   links
Amigos de Bolsa Chica
P.O Box 1563
Huntington Beach, CA 92647
Phone / Fax 714.840.1575
Email: info@amigosdebolsachica.org
© 2008 Amigos de Bolsa Chica, all rights reserved.