The full
tidal area was excavated with heavy construction machinery down to about sea
level. Over 2.5 million cubic yards of sand and soil were eventually removed
from the full tidal basin. The full tidal basin was flooded to about 5
feet of water to float a dredge that would do the final contouring of the
basin. A perimeter levee was constructed to contain the water in the full
tidal basin once it was open to the ocean. Three culverts were installed to
supply the muted tidal wetland with water from the full tidal basin. To
protect nearby residences from water intrusion, a 10,000 foot ground water
barrier was placed along |